| PD-01 | Supply | Incoming arrangement, metering position, main isolation and main earthing. | Origin of the installation and the route from it into the property. | Landlord supply arrangements, shared intake positions and metering responsibility. | Survey |
| PD-02 | Consumer unit / distribution board | Existing board type, ways available, protective devices and labelling. | Whether additional circuits can be accommodated as the property stands. | Sub-distribution, board locations and how boards serve areas or tenancies. | Survey |
| PD-03 | Final circuits | Existing circuit arrangement, cable routes and accessory positions. | Ring and radial socket circuits, lighting circuits and dedicated appliance feeds. | Circuits serving workstations, plant, catering, retail displays and back of house. | Design |
| PD-04 | Socket circuits | Positions, quantities, accessory types and equipment to be connected. | Kitchen, utility, home office, bedrooms, exterior and outbuilding requirements. | Desk power, floor boxes, cleaners sockets, stockroom and plant connections. | Design |
| PD-05 | Lighting circuits | Fitting types, light levels sought, switching arrangement and control method. | Room-by-room lighting, external lighting and any feature or task lighting. | General area lighting, task lighting, display lighting and control zoning. | Design |
| PD-06 | Load considerations | Connected equipment, diversity, and how much the existing arrangement is already doing. | Electric heating, showers, ovens, hobs and any EV charging under consideration. | Catering equipment, HVAC, machinery, IT loads and planned business expansion. | Assessment |
| PD-07 | Equipment requirements | What is being connected, who supplies it, and its electrical requirements. | Appliances, garden equipment, hot tubs, home offices and outbuilding supplies. | Tenant equipment, specialist plant, supplier-provided items and installation data. | Client input |
| PD-08 | Future capacity | Whether the arrangement leaves room for what is expected next. | Loft conversions, extensions, garden rooms, EV readiness and appliance changes. | Additional workstations, plant changes, fit-out changes and growth plans. | Planning |
| PD-09 | Testing | Inspection and testing appropriate to the type of work carried out. | Verification of new work and any findings relating to the wider installation. | Verification within operational constraints and agreed access windows. | On completion |
| PD-10 | Documentation | What is recorded, who receives it and what remains outstanding. | Records for the homeowner, or for landlord and letting-agent purposes. | Records for managing agents, main contractors, tenants and building files. | On completion |